<?xml version="1.0" encoding="UTF-8" ?><!-- generator=Zoho Sites --><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/"><channel><atom:link href="https://www.gsdworks.com.au/case-studies/tag/zoho/feed" rel="self" type="application/rss+xml"/><title>Growth System Design - Case Studies #Zoho</title><description>Growth System Design - Case Studies #Zoho</description><link>https://www.gsdworks.com.au/case-studies/tag/zoho</link><lastBuildDate>Fri, 07 Aug 2026 22:09:20 +1000</lastBuildDate><generator>http://zoho.com/sites/</generator><item><title><![CDATA[Master data cleanup]]></title><link>https://www.gsdworks.com.au/case-studies/post/master-data-cleanup</link><description><![CDATA[<img align="left" hspace="5" src="https://www.gsdworks.com.au/ERP inputs to outputs hero.png"/>Stabilised ERP purchasing and planning by cleaning up master data (products, locations, vendors, BoMs) and introducing standards (naming conventions, mandatory fields). Assigned clear data owners to prevent relapse. Result: more reliable system signals and less downstream rework.]]></description><content:encoded><![CDATA[<div class="zpcontent-container blogpost-container "><div data-element-id="elm_VFtO4T9VRTiEh1OWd9UeRQ" data-element-type="section" class="zpsection "><style type="text/css"></style><div class="zpcontainer-fluid zpcontainer"><div data-element-id="elm_6ith8KEZSleadGKYWakANQ" data-element-type="row" class="zprow zprow-container zpalign-items- zpjustify-content- " data-equal-column=""><style type="text/css"></style><div data-element-id="elm_7-rsvcirRWajhFJ5sHxI5A" data-element-type="column" class="zpelem-col zpcol-12 zpcol-md-12 zpcol-sm-12 zpalign-self- "><style type="text/css"></style><div data-element-id="elm_nALsyntxRlmaae0-XH5JfA" data-element-type="heading" class="zpelement zpelem-heading "><style></style><h2
 class="zpheading zpheading-align-center zpheading-align-mobile-center zpheading-align-tablet-center " data-editor="true"><span>Master data cleanup to stabilise ERP (products, locations, vendors, BoMs)</span></h2></div>
<div data-element-id="elm_AlAL0Td9RpqZ9dRloEtagg" data-element-type="text" class="zpelement zpelem-text "><style></style><div class="zptext zptext-align-center zptext-align-mobile-center zptext-align-tablet-center " data-editor="true"><p style="text-align:left;"><strong>Client&nbsp;</strong></p><p></p><div><div><p style="text-align:left;">Manufacturing and warehousing businesses using ERP for purchasing and planning.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>The challenge&nbsp;</strong></p><p style="text-align:left;">Poor master data breaks purchasing and planning. When product records, locations, vendors, and BoMs are inconsistent, the ERP cannot produce reliable signals. Teams then revert to manual workarounds.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>What we did&nbsp;</strong></p><p style="text-align:left;">We stabilised ERP performance by cleaning up master data and introducing standards.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>Standards introduced:&nbsp;</strong></p><p style="text-align:left;">• Naming conventions&nbsp;</p><p style="text-align:left;">• Mandatory fields&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>How we prevented relapse&nbsp;</strong></p><p style="text-align:left;">• Clear owners of information were assigned&nbsp;</p><p style="text-align:left;">• Ongoing responsibility to maintain data quality was made explicit, so master data did not become “everyone’s problem and no one’s job”&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>Results&nbsp;</strong></p><p style="text-align:left;">• Purchasing and planning became more reliable because the system inputs were consistent&nbsp;</p><p style="text-align:left;">• Teams spent less time correcting errors downstream&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>Why it matters&nbsp;</strong></p><p style="text-align:left;">Master data is not an admin task. It is operational infrastructure. When it is owned and maintained, the ERP becomes a tool for decision-making rather than a source of confusion.</p></div></div></div>
</div><div data-element-id="elm_Aro4JRUOtY3bBDIbKpyyOA" data-element-type="buttonicon" class="zpelement zpelem-buttonicon zscsutom-banner-btn "><style> [data-element-id="elm_Aro4JRUOtY3bBDIbKpyyOA"].zpelem-buttonicon{ border-radius:1px; } </style><div class="zpbutton-container zpbutton-align-center zpbutton-align-mobile-left zpbutton-align-tablet-left "><style type="text/css"></style><a class="zpbutton-wrapper zpbutton zpbutton-type-primary zpbutton-size-lg zpbutton-style-oval zpbutton-icon-align-right " href="javascript:;" title="Book a free intro call" title="Book a free intro call"><span class="zpbutton-icon "><svg viewBox="0 0 24 24" height="24" width="24" xmlns="http://www.w3.org/2000/svg"><path d="M10.5253 5.49475L10.5206 7.49475L15.0782 7.50541L5.47473 17.0896L6.88752 18.5052L16.5173 8.89479L16.5065 13.5088L18.5065 13.5134L18.5253 5.51345L10.5253 5.49475Z"></path></svg></span><span class="zpbutton-content">Let's Talk</span></a></div>
</div></div></div></div></div></div> ]]></content:encoded><pubDate>Sun, 12 Jul 2026 00:54:49 +0000</pubDate></item><item><title><![CDATA[Non-conformance ]]></title><link>https://www.gsdworks.com.au/case-studies/post/non-conformance</link><description><![CDATA[<img align="left" hspace="5" src="https://www.gsdworks.com.au/CAPA-lite workflow hero.png"/>Implemented a lightweight non-conformance + corrective action workflow that teams actually used (native quality app or a controlled Excel log). Enabled simple issue logging, owner assignment, and follow-up. Result: faster containment, clearer accountability, and fewer repeat issues.]]></description><content:encoded><![CDATA[<div class="zpcontent-container blogpost-container "><div data-element-id="elm_cueSliznT76BWye_3L3PJw" data-element-type="section" class="zpsection "><style type="text/css"></style><div class="zpcontainer-fluid zpcontainer"><div data-element-id="elm_3iY0zA0MStmiMSe8Uh1Www" data-element-type="row" class="zprow zprow-container zpalign-items- zpjustify-content- " data-equal-column=""><style type="text/css"></style><div data-element-id="elm_hnSKRxBWR7qVgMRhtgZIjA" data-element-type="column" class="zpelem-col zpcol-12 zpcol-md-12 zpcol-sm-12 zpalign-self- "><style type="text/css"></style><div data-element-id="elm_IYKeQnE0RAaf42_eY4hSNA" data-element-type="heading" class="zpelement zpelem-heading "><style></style><h2
 class="zpheading zpheading-align-center zpheading-align-mobile-center zpheading-align-tablet-center " data-editor="true"><span><span>Non-conformance and corrective action workflow (CAPA-lite) that actually gets used</span></span></h2></div>
<div data-element-id="elm_47iCl23cQh6uDFiBKBsAbg" data-element-type="text" class="zpelement zpelem-text "><style></style><div class="zptext zptext-align-center zptext-align-mobile-center zptext-align-tablet-center " data-editor="true"><p style="text-align:left;"></p><p style="text-align:left;"><strong>Client&nbsp;</strong></p><p style="text-align:left;"><span><span>Small and mid-sized manufacturers who needed practical quality accountability without heavy bureaucracy.</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><span><span style="font-weight:bold;">The challenge&nbsp;</span></span></p><p style="text-align:left;"><span><span>Many SMEs either have no non-conformance process, or they have a process that is too complex to maintain. The result is repeat issues and a familiar pattern: “We had this problem before. What did we do last time?”&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><strong>What we did&nbsp;</strong></p><p style="text-align:left;"><span><span>We implemented a lightweight non-conformance and corrective action workflow that teams could actually sustain. Depending on the environment:&nbsp;</span></span></p><p style="text-align:left;">• In some systems, the native quality app was used for logging&nbsp;</p><p style="text-align:left;">• In other cases, a controlled Excel-based log was implemented where it was the most practical option&nbsp;</p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><span><span style="font-weight:bold;">What ‘good enough’ looked like&nbsp;</span></span></p><p style="text-align:left;"><span><span>• Basic logging of issues&nbsp;</span></span></p><p style="text-align:left;"><span><span>• Tracking of resolutions&nbsp;</span></span></p><p style="text-align:left;"><span><span>• Clear accountability through assigned owners and follow-up&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><strong>Results&nbsp;</strong></p><p style="text-align:left;"><span><span>• Clearer accountability&nbsp;</span></span></p><p style="text-align:left;"><span><span>• Faster containment and resolution&nbsp;</span></span></p><p style="text-align:left;"><span><span>• Reduced repeat issues because previous actions were visible and searchable&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><span><span style="font-weight:bold;">Why it matters&nbsp;</span></span></p><p style="text-align:left;"><span><span>A simple quality workflow that gets used beats a perfect workflow that gets ignored. The goal is not paperwork. The goal is learning and repeatability.&nbsp;</span></span></p></div>
</div><div data-element-id="elm_ezNG9-Z7RzHie58w0fy2xg" data-element-type="buttonicon" class="zpelement zpelem-buttonicon zscsutom-banner-btn "><style> [data-element-id="elm_ezNG9-Z7RzHie58w0fy2xg"].zpelem-buttonicon{ border-radius:1px; } </style><div class="zpbutton-container zpbutton-align-center zpbutton-align-mobile-left zpbutton-align-tablet-left "><style type="text/css"></style><a class="zpbutton-wrapper zpbutton zpbutton-type-primary zpbutton-size-lg zpbutton-style-oval zpbutton-icon-align-right " href="javascript:;" title="Book a free intro call" title="Book a free intro call"><span class="zpbutton-icon "><svg viewBox="0 0 24 24" height="24" width="24" xmlns="http://www.w3.org/2000/svg"><path d="M10.5253 5.49475L10.5206 7.49475L15.0782 7.50541L5.47473 17.0896L6.88752 18.5052L16.5173 8.89479L16.5065 13.5088L18.5065 13.5134L18.5253 5.51345L10.5253 5.49475Z"></path></svg></span><span class="zpbutton-content">Let's Talk</span></a></div>
</div></div></div></div></div></div> ]]></content:encoded><pubDate>Sun, 12 Jul 2026 00:42:12 +0000</pubDate></item><item><title><![CDATA[Routing and work centres]]></title><link>https://www.gsdworks.com.au/case-studies/post/routing-and-work-centres</link><description><![CDATA[<img align="left" hspace="5" src="https://www.gsdworks.com.au/Capacity planning routing hero.png"/>Implemented realistic routing and work-centre data (setup/run times) using motion studies. Capacity plans reflected real constraints, reducing overtime and rescheduling. Work was split into linked high-skill and low-skill steps, easing bottlenecks and increasing output.]]></description><content:encoded><![CDATA[<div class="zpcontent-container blogpost-container "><div data-element-id="elm_fhJ2ZXhBTAapETW2SZ5hjQ" data-element-type="section" class="zpsection "><style type="text/css"></style><div class="zpcontainer-fluid zpcontainer"><div data-element-id="elm_MkDO1LsdRnG-PZGn2Q3S1Q" data-element-type="row" class="zprow zprow-container zpalign-items- zpjustify-content- " data-equal-column=""><style type="text/css"></style><div data-element-id="elm_tkzrKKjQRZKJHUqtR3FjKw" data-element-type="column" class="zpelem-col zpcol-12 zpcol-md-12 zpcol-sm-12 zpalign-self- "><style type="text/css"></style><div data-element-id="elm_lSpa8jy_RD-vvMEqhAOv3w" data-element-type="heading" class="zpelement zpelem-heading "><style></style><h2
 class="zpheading zpheading-align-center zpheading-align-mobile-center zpheading-align-tablet-center " data-editor="true"><span>Routing and work centre setup for realistic capacity planning</span></h2></div>
<div data-element-id="elm_n7I5j9RbT9GZ7tkJTP8lfA" data-element-type="text" class="zpelement zpelem-text "><style></style><div class="zptext zptext-align-center zptext-align-mobile-center zptext-align-tablet-center " data-editor="true"><p style="text-align:left;"><span><span style="font-weight:bold;">Client&nbsp;</span></span></p><p style="text-align:left;"><span><span>Manufacturing businesses that needed realistic capacity planning and better labour utilisation.&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><strong>The challenge&nbsp;</strong></p><p style="text-align:left;"><span><span>When run times, setup times, and work centre capacity are not defined properly, schedules become optimistic and delivery promises become unreliable. Teams compensate with overtime and constant rescheduling.&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><span><span style="font-weight:bold;">What we did&nbsp;</span></span></p><p style="text-align:left;"><span><span>We implemented routing and work centre data that reflected real work.&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><strong>This included:&nbsp;</strong></p><p style="text-align:left;"><span><span>• Defining run times and setup times&nbsp;</span></span></p><p style="text-align:left;"><span><span>• Using motion studies to validate time assumptions What became visible Once routing data was realistic, it became clear that some tasks could be split into two linked activities:&nbsp;</span></span></p><p style="text-align:left;"><span><span>• A higher-skilled portion of the work&nbsp;</span></span></p><p style="text-align:left;"><span><span>• A lower-skilled portion of the work This maintained one-piece flow while allowing higher-skilled workers to focus their energy where it created the most value.&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><span><span style="font-weight:bold;">Results&nbsp;</span></span></p><p style="text-align:left;"><span><span>• Higher output with less overtime</span></span></p><p style="text-align:left;"><span><span>&nbsp;• Reduced bottlenecks because labour allocation matched the true constraint&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><strong>Why it matters&nbsp;</strong></p><p style="text-align:left;"><span><span>Capacity planning is only as good as the data behind it. When routing and work centre assumptions match reality, scheduling becomes a practical tool instead of a constant negotiation.&nbsp;</span></span></p></div>
</div><div data-element-id="elm_-vqMiMZ27N9C5bByBoVJCA" data-element-type="buttonicon" class="zpelement zpelem-buttonicon zscsutom-banner-btn "><style> [data-element-id="elm_-vqMiMZ27N9C5bByBoVJCA"].zpelem-buttonicon{ border-radius:1px; } </style><div class="zpbutton-container zpbutton-align-center zpbutton-align-mobile-left zpbutton-align-tablet-left "><style type="text/css"></style><a class="zpbutton-wrapper zpbutton zpbutton-type-primary zpbutton-size-lg zpbutton-style-oval zpbutton-icon-align-right " href="javascript:;" title="Book a free intro call" title="Book a free intro call"><span class="zpbutton-icon "><svg viewBox="0 0 24 24" height="24" width="24" xmlns="http://www.w3.org/2000/svg"><path d="M10.5253 5.49475L10.5206 7.49475L15.0782 7.50541L5.47473 17.0896L6.88752 18.5052L16.5173 8.89479L16.5065 13.5088L18.5065 13.5134L18.5253 5.51345L10.5253 5.49475Z"></path></svg></span><span class="zpbutton-content">Let's Talk</span></a></div>
</div></div></div></div></div></div> ]]></content:encoded><pubDate>Sun, 12 Jul 2026 00:32:42 +0000</pubDate></item><item><title><![CDATA[BoM cleanup in ERP]]></title><link>https://www.gsdworks.com.au/case-studies/post/bom-cleanup-in-erp</link><description><![CDATA[<img align="left" hspace="5" src="https://www.gsdworks.com.au/BoM cleanup ERP hero.png"/>Cleaned up ERP Bills of Materials and aligned them with clear, complete work instructions to stop production errors, rework, and costing drift. Introduced PLM-style control (ownership, sign-offs, approvals) so changes were governed, improving inventory accuracy and margin visibility.]]></description><content:encoded><![CDATA[<div class="zpcontent-container blogpost-container "><div data-element-id="elm_R41_phbTRdOS_qLI9ylFUg" data-element-type="section" class="zpsection "><style type="text/css"></style><div class="zpcontainer-fluid zpcontainer"><div data-element-id="elm_6fOC0kJTTlOFJPoW1sfjrw" data-element-type="row" class="zprow zprow-container zpalign-items- zpjustify-content- " data-equal-column=""><style type="text/css"></style><div data-element-id="elm_oQwSeFKuQcSv3rKQd5DYCQ" data-element-type="column" class="zpelem-col zpcol-12 zpcol-md-12 zpcol-sm-12 zpalign-self- "><style type="text/css"></style><div data-element-id="elm_l0_dmcRVRkiaiMySn8JoLA" data-element-type="heading" class="zpelement zpelem-heading "><style></style><h2
 class="zpheading zpheading-align-center zpheading-align-mobile-center zpheading-align-tablet-center " data-editor="true"><span><span>BoM cleanup in ERP to prevent production errors and improve costing&nbsp;</span></span></h2></div>
<div data-element-id="elm_yhGRQ8xGTUKOyqxRkUUuaQ" data-element-type="text" class="zpelement zpelem-text "><style></style><div class="zptext zptext-align-center zptext-align-mobile-center zptext-align-tablet-center " data-editor="true"><p style="text-align:left;"><strong>Client&nbsp;</strong></p><p style="text-align:left;">Manufacturing businesses using ERP systems to manage product data and production execution.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>The challenge&nbsp;</strong></p><p style="text-align:left;">Bills of Materials (BoMs) and work instructions often drift apart. For example, the BoM might specify one quantity or component, while the instruction on the floor specifies something different. When instructions are unclear or incomplete, teams compensate with workarounds.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><span style="font-weight:bold;">That creates:&nbsp;</span></p><p style="text-align:left;">• Production errors and rework&nbsp;</p><p style="text-align:left;">• Inventory discrepancies that are difficult to explain&nbsp;</p><p style="text-align:left;">• Unreliable product costing What we did We cleaned up BoMs and aligned them with clear, complete production instructions.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>How we controlled changes&nbsp;</strong></p><p style="text-align:left;">We implemented a product lifecycle management approach:&nbsp;</p><p style="text-align:left;">• BoMs and instructions were maintained through product management, not informally on the floor&nbsp;</p><p style="text-align:left;">• Sign-offs and approvals were required from relevant parties before changes went live&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>Results&nbsp;</strong></p><p style="text-align:left;">• Increased inventory accuracy&nbsp;</p><p style="text-align:left;">• Fewer questions and less time spent investigating discrepancies&nbsp;</p><p style="text-align:left;">• More accurate costing because consumption and structure were consistent&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><span style="font-weight:bold;">Why it matters&nbsp;</span></p><p style="text-align:left;"></p><p style="text-align:left;">BoM accuracy is foundational. When BoMs and instructions match the real process, everything downstream improves, including purchasing, planning, inventory, and margin visibility.&nbsp;</p></div>
</div><div data-element-id="elm_woZTYlvG-6uYbG8HfI-nQw" data-element-type="buttonicon" class="zpelement zpelem-buttonicon zscsutom-banner-btn "><style> [data-element-id="elm_woZTYlvG-6uYbG8HfI-nQw"].zpelem-buttonicon{ border-radius:1px; } </style><div class="zpbutton-container zpbutton-align-center zpbutton-align-mobile-left zpbutton-align-tablet-left "><style type="text/css"></style><a class="zpbutton-wrapper zpbutton zpbutton-type-primary zpbutton-size-lg zpbutton-style-oval zpbutton-icon-align-right " href="javascript:;" title="Book a free intro call" title="Book a free intro call"><span class="zpbutton-icon "><svg viewBox="0 0 24 24" height="24" width="24" xmlns="http://www.w3.org/2000/svg"><path d="M10.5253 5.49475L10.5206 7.49475L15.0782 7.50541L5.47473 17.0896L6.88752 18.5052L16.5173 8.89479L16.5065 13.5088L18.5065 13.5134L18.5253 5.51345L10.5253 5.49475Z"></path></svg></span><span class="zpbutton-content">Let's Talk</span></a></div>
</div></div></div></div></div></div> ]]></content:encoded><pubDate>Sun, 12 Jul 2026 00:24:40 +0000</pubDate></item><item><title><![CDATA[Production scheduling systemisation]]></title><link>https://www.gsdworks.com.au/case-studies/post/production-scheduling-systemisation</link><description><![CDATA[<img align="left" hspace="5" src="https://www.gsdworks.com.au/Production scheduling systemisation.png"/>Replaced spreadsheet-based production scheduling with system workflows that kept priorities live and visible (across Odoo, Zoho and Pronto). Shopfloor teams worked more autonomously, order tracking improved, and admin time dropped by shifting planning to exceptions, not daily spreadsheet upkeep.]]></description><content:encoded><![CDATA[<div class="zpcontent-container blogpost-container "><div data-element-id="elm_uKPBC2dtSTqVPri0t7VUaQ" data-element-type="section" class="zpsection "><style type="text/css"></style><div class="zpcontainer-fluid zpcontainer"><div data-element-id="elm_-LAVpKBwRSOTTsq6ov1ITg" data-element-type="row" class="zprow zprow-container zpalign-items- zpjustify-content- " data-equal-column=""><style type="text/css"></style><div data-element-id="elm_bmv5hDv7ShKYu-tKPDW_RQ" data-element-type="column" class="zpelem-col zpcol-12 zpcol-md-12 zpcol-sm-12 zpalign-self- "><style type="text/css"></style><div data-element-id="elm_5tZnvEFrT6yfEwnuCYyUzg" data-element-type="heading" class="zpelement zpelem-heading "><style></style><h2
 class="zpheading zpheading-align-center zpheading-align-mobile-center zpheading-align-tablet-center " data-editor="true"><span><span>Production scheduling moved from spreadsheets to a system workflow (improved delivery performance)</span></span></h2></div>
<div data-element-id="elm_ED4Hzo3HQZeTiTpkcf4JcA" data-element-type="text" class="zpelement zpelem-text "><style></style><div class="zptext zptext-align-center zptext-align-mobile-center zptext-align-tablet-center " data-editor="true"><p style="text-align:left;"><strong>Client&nbsp;</strong></p><p style="text-align:left;">Manufacturing businesses using Odoo, Zoho, and Pronto.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>The challenge&nbsp;</strong></p><p style="text-align:left;">Spreadsheet-based production scheduling often fails in the same ways:&nbsp;</p><p style="text-align:left;">• Information becomes outdated quickly&nbsp;</p><p style="text-align:left;">• Version control breaks down&nbsp;</p><p style="text-align:left;">• The schedule depends on a subject matter expert to keep it alive&nbsp;</p><p style="text-align:left;">• When that person is absent, the shopfloor loses direction In some cases, maintaining the spreadsheet required up to 6 hours per day of admin effort.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>What we did&nbsp;</strong></p><p style="text-align:left;">We replaced spreadsheet scheduling with system-based workflows that created live visibility and clear priorities.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><span style="font-weight:bold;">Examples across systems:&nbsp;</span></p><p style="text-align:left;">• Odoo: Used standard manufacturing functionality and introduced priority rules for manufacturing orders based on whether they were required for delivery orders or stock orders. Stock orders were prioritised based on inventory levels.&nbsp;</p><p style="text-align:left;">• Zoho: Built a custom planning tool in Zoho Creator, including a planning algorithm to handle complex manufacturing flows and constraints such as tool and space limitations.&nbsp;</p><p style="text-align:left;">• Pronto: Implemented a custom prioritization algorithm for delivery orders based on destination state.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>Results&nbsp;</strong></p><p style="text-align:left;">• Shopfloor staff could work more autonomously because priorities were visible and current&nbsp;</p><p style="text-align:left;">• Live tracking of orders through manufacturing improved day-to-day coordination&nbsp;</p><p style="text-align:left;">• Admin time dropped significantly because planning focused on exceptions rather than manually maintaining every detail&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>Why it matters&nbsp;</strong></p><p style="text-align:left;"></p><p style="text-align:left;"></p><p></p><p></p><p style="text-align:left;"></p><p></p><p></p><p style="text-align:left;">The biggest gain from “moving off spreadsheets” is not technology. It is operational resilience. When priorities are visible and current, production can keep moving without bottlenecks around a single planner.&nbsp;</p><p style="text-align:left;"></p></div>
</div><div data-element-id="elm_swbHvlPEKsW94QqHIExkbA" data-element-type="buttonicon" class="zpelement zpelem-buttonicon zscsutom-banner-btn "><style> [data-element-id="elm_swbHvlPEKsW94QqHIExkbA"].zpelem-buttonicon{ border-radius:1px; } </style><div class="zpbutton-container zpbutton-align-center zpbutton-align-mobile-left zpbutton-align-tablet-left "><style type="text/css"></style><a class="zpbutton-wrapper zpbutton zpbutton-type-primary zpbutton-size-lg zpbutton-style-oval zpbutton-icon-align-right " href="javascript:;" title="Book a free intro call" title="Book a free intro call"><span class="zpbutton-icon "><svg viewBox="0 0 24 24" height="24" width="24" xmlns="http://www.w3.org/2000/svg"><path d="M10.5253 5.49475L10.5206 7.49475L15.0782 7.50541L5.47473 17.0896L6.88752 18.5052L16.5173 8.89479L16.5065 13.5088L18.5065 13.5134L18.5253 5.51345L10.5253 5.49475Z"></path></svg></span><span class="zpbutton-content">Let's Talk</span></a></div>
</div></div></div></div></div></div> ]]></content:encoded><pubDate>Sun, 12 Jul 2026 00:16:53 +0000</pubDate></item><item><title><![CDATA[Cycle counting program ]]></title><link>https://www.gsdworks.com.au/case-studies/post/cycle-counting-program</link><description><![CDATA[<img align="left" hspace="5" src="https://www.gsdworks.com.au/Cycle counting cover image.png"/>The challenge&nbsp; Annual stocktakes are disruptive and expensive. At the same time, many businesses still experience stockouts caused by incorrect st ]]></description><content:encoded><![CDATA[<div class="zpcontent-container blogpost-container "><div data-element-id="elm_N9_llagvRZuiy4kRGWnwJw" data-element-type="section" class="zpsection "><style type="text/css"></style><div class="zpcontainer-fluid zpcontainer"><div data-element-id="elm_OvfLyTmYT4uh9uLA4Wei4g" data-element-type="row" class="zprow zprow-container zpalign-items- zpjustify-content- " data-equal-column=""><style type="text/css"></style><div data-element-id="elm_zC1w2jjiSFy-shIrOk0CQQ" data-element-type="column" class="zpelem-col zpcol-12 zpcol-md-12 zpcol-sm-12 zpalign-self- "><style type="text/css"></style><div data-element-id="elm_Rs8fXbazTzwcWLziwjH2-w" data-element-type="heading" class="zpelement zpelem-heading "><style></style><h2
 class="zpheading zpheading-style-none zpheading-align-center zpheading-align-mobile-left zpheading-align-tablet-left " data-editor="true"><span>Cycle counting program that improved inventory accuracy without shutting down for stock takes</span></h2></div>
<div data-element-id="elm_FrIDLfCvSyq-EYi1VmEMGQ" data-element-type="text" class="zpelement zpelem-text "><style></style><div class="zptext zptext-align-center zptext-align-mobile-center zptext-align-tablet-center " data-editor="true"><p style="text-align:left;"></p><p style="text-align:left;"><strong>The challenge&nbsp;</strong></p><p style="text-align:left;">Annual stocktakes are disruptive and expensive. At the same time, many businesses still experience stockouts caused by incorrect stock levels, not true shortages. When inventory accuracy is unreliable, planning and purchasing become guesswork.&nbsp;</p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><strong>What we did&nbsp;</strong></p><p style="text-align:left;"><span><span>We implemented a practical cycle counting cadence that improved inventory accuracy while keeping operations running.&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"></p><p style="text-align:left;"><strong>The program design:</strong>&nbsp;</p><p style="text-align:left;">• Weekly cycle counts • 20–30 SKUs per cycle&nbsp;</p><p style="text-align:left;">• Counts performed by the people closest to the inventory location (warehouse staff for warehouse locations, shopfloor staff for shopfloor locations) How we handled discrepancies&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;">To keep the process credible and prevent “paper fixes,” we used simple, enforceable controls:&nbsp;</p><p style="text-align:left;">• Four-eyed counts (a second person verifies)&nbsp;</p><p style="text-align:left;">• Recounts triggered when discrepancies exceeded 10%&nbsp;</p><p style="text-align:left;">• Official reporting and follow-up for discrepancies larger than 10% by cost or quantity&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>Results&nbsp;</strong></p><p style="text-align:left;">• Stockouts caused by incorrect stock levels reduced significantly&nbsp;</p><p style="text-align:left;">• Inventory became trusted enough to support better purchasing and planning decisions&nbsp;</p><p style="text-align:left;">• The business reduced reliance on disruptive full stocktakes by building accuracy continuously&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>Why it matters&nbsp;</strong></p><p style="text-align:left;">Cycle counting works when it is operationally owned, consistent, and tied to clear discrepancy rules. The outcome is not just better numbers in the system. It is fewer surprises and more predictable fulfilment.&nbsp;</p></div>
</div><div data-element-id="elm_VgvlKLfpWI_lXJkgP4dGdg" data-element-type="buttonicon" class="zpelement zpelem-buttonicon zscsutom-banner-btn "><style> [data-element-id="elm_VgvlKLfpWI_lXJkgP4dGdg"].zpelem-buttonicon{ border-radius:1px; } </style><div class="zpbutton-container zpbutton-align-center zpbutton-align-mobile-left zpbutton-align-tablet-left "><style type="text/css"></style><a class="zpbutton-wrapper zpbutton zpbutton-type-primary zpbutton-size-lg zpbutton-style-oval zpbutton-icon-align-right " href="javascript:;" title="Book a free intro call" title="Book a free intro call"><span class="zpbutton-icon "><svg viewBox="0 0 24 24" height="24" width="24" xmlns="http://www.w3.org/2000/svg"><path d="M10.5253 5.49475L10.5206 7.49475L15.0782 7.50541L5.47473 17.0896L6.88752 18.5052L16.5173 8.89479L16.5065 13.5088L18.5065 13.5134L18.5253 5.51345L10.5253 5.49475Z"></path></svg></span><span class="zpbutton-content">Let's Talk</span></a></div>
</div></div></div></div></div></div> ]]></content:encoded><pubDate>Sun, 05 Jul 2026 01:14:23 +0000</pubDate></item><item><title><![CDATA[Reorder rules in ERP]]></title><link>https://www.gsdworks.com.au/case-studies/post/reorder-rules-in-erp</link><description><![CDATA[<img align="left" hspace="5" src="https://www.gsdworks.com.au/Replenishment timeline flow cover.png"/>We rebuilt ERP replenishment by fixing lead times and reorder rules so ordering became consistent and data-driven. Stockouts dropped, fill rates improved, and teams spent less time expediting and firefighting.]]></description><content:encoded><![CDATA[<div class="zpcontent-container blogpost-container "><div data-element-id="elm_8Jd9PsxKRNuorfz_36u2NQ" data-element-type="section" class="zpsection "><style type="text/css"></style><div class="zpcontainer-fluid zpcontainer"><div data-element-id="elm_caiRWZWVQHaAIr_8pg2sJA" data-element-type="row" class="zprow zprow-container zpalign-items- zpjustify-content- " data-equal-column=""><style type="text/css"></style><div data-element-id="elm_tfQNy6qjQx6SuH_pkRZWGA" data-element-type="column" class="zpelem-col zpcol-12 zpcol-md-12 zpcol-sm-12 zpalign-self- "><style type="text/css"></style><div data-element-id="elm_dS7lcoa1G3ma8JeRfWsNxw" data-element-type="heading" class="zpelement zpelem-heading "><style></style><h2
 class="zpheading zpheading-style-none zpheading-align-center zpheading-align-mobile-left zpheading-align-tablet-left " data-editor="true"><span>Reduced stockouts by fixing reorder rules and lead times in ERP</span></h2></div>
<div data-element-id="elm_cxY3fY4WSDmLItVUqxYd8g" data-element-type="text" class="zpelement zpelem-text "><style></style><div class="zptext zptext-align-center zptext-align-mobile-center zptext-align-tablet-center " data-editor="true"><p style="text-align:left;"><span style="font-weight:bold;">Client&nbsp;</span></p><p style="text-align:left;">Multiple businesses across chemical manufacturing, furniture, building supplies, and small retail.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>The challenge</strong>&nbsp;</p><p style="text-align:left;">These businesses had an ERP in place, but replenishment still behaved like a manual process. Stock decisions were often driven by gut feel, firefighting, or whoever noticed a problem first.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;">That created predictable symptoms:&nbsp;</p><p style="text-align:left;">• Stockouts and backorders that disrupted customer service&nbsp;</p><p style="text-align:left;">• Expediting and urgent purchasing that increased cost and stress&nbsp;</p><p style="text-align:left;">• Low confidence in lead times and availability,&nbsp;which made planning unreliable&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>What we did&nbsp;</strong></p><p style="text-align:left;">We rebuilt replenishment so the ERP functioned as a true inventory control system, not just a record-keeping database.&nbsp;</p><p style="text-align:left;">Depending on the environment, the work typically included:&nbsp;</p><p style="text-align:left;">• Correcting and standardising lead times so planning reflected reality&nbsp;</p><p style="text-align:left;">• Implementing reorder logic and replenishment rules that matched actual consumption&nbsp;</p><p style="text-align:left;">• Establishing clearer stocking targets so ordering decisions were consistent and repeatable&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>How we approached it&nbsp;</strong></p><p style="text-align:left;">We focused on operational behaviours as much as system configuration. The goal was to change ordering habits so decisions were driven by data and agreed rules, rather than intuition.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><span style="font-weight:bold;">That meant:&nbsp;</span></p><p style="text-align:left;">• Making replenishment signals visible and trustworthy&nbsp;</p><p style="text-align:left;">• Ensuring the rules were practical enough that teams would actually follow them&nbsp;</p><p style="text-align:left;">• Reducing reliance on a single person “keeping an eye on things”&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>Results&nbsp;</strong></p><p style="text-align:left;">Across these engagements, the most meaningful outcome was improved serviceability.&nbsp;</p><p style="text-align:left;">• Fill rates improved because stock was available and ready to ship when customer orders were placed&nbsp;</p><p style="text-align:left;">• Teams spent less time reacting to shortages and more time executing planned work&nbsp;</p><p style="text-align:left;">• Replenishment became more consistent, which reduced avoidable urgency in purchasing and production&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>Why it matters&nbsp;</strong></p><p style="text-align:left;">Many small and mid-sized manufacturers and distributors already have an ERP. The difference between constant stockouts and stable fulfilment is usually not the software. It is whether replenishment rules, lead times, and day-to-day behaviours are aligned</p></div>
</div><div data-element-id="elm_Yr-ta6yvvXH958G037ILuw" data-element-type="buttonicon" class="zpelement zpelem-buttonicon zscsutom-banner-btn "><style> [data-element-id="elm_Yr-ta6yvvXH958G037ILuw"].zpelem-buttonicon{ border-radius:1px; } </style><div class="zpbutton-container zpbutton-align-center zpbutton-align-mobile-left zpbutton-align-tablet-left "><style type="text/css"></style><a class="zpbutton-wrapper zpbutton zpbutton-type-primary zpbutton-size-lg zpbutton-style-oval zpbutton-icon-align-right " href="javascript:;" title="Book a free intro call" title="Book a free intro call"><span class="zpbutton-icon "><svg viewBox="0 0 24 24" height="24" width="24" xmlns="http://www.w3.org/2000/svg"><path d="M10.5253 5.49475L10.5206 7.49475L15.0782 7.50541L5.47473 17.0896L6.88752 18.5052L16.5173 8.89479L16.5065 13.5088L18.5065 13.5134L18.5253 5.51345L10.5253 5.49475Z"></path></svg></span><span class="zpbutton-content">Let's Talk</span></a></div>
</div></div></div></div></div></div> ]]></content:encoded><pubDate>Sun, 05 Jul 2026 01:07:35 +0000</pubDate></item></channel></rss>