<?xml version="1.0" encoding="UTF-8" ?><!-- generator=Zoho Sites --><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/"><channel><atom:link href="https://www.gsdworks.com.au/case-studies/tag/ms-access/feed" rel="self" type="application/rss+xml"/><title>Growth System Design - Case Studies #MS Access</title><description>Growth System Design - Case Studies #MS Access</description><link>https://www.gsdworks.com.au/case-studies/tag/ms-access</link><lastBuildDate>Fri, 07 Aug 2026 22:09:07 +1000</lastBuildDate><generator>http://zoho.com/sites/</generator><item><title><![CDATA[Master data cleanup]]></title><link>https://www.gsdworks.com.au/case-studies/post/master-data-cleanup</link><description><![CDATA[<img align="left" hspace="5" src="https://www.gsdworks.com.au/ERP inputs to outputs hero.png"/>Stabilised ERP purchasing and planning by cleaning up master data (products, locations, vendors, BoMs) and introducing standards (naming conventions, mandatory fields). Assigned clear data owners to prevent relapse. Result: more reliable system signals and less downstream rework.]]></description><content:encoded><![CDATA[<div class="zpcontent-container blogpost-container "><div data-element-id="elm_VFtO4T9VRTiEh1OWd9UeRQ" data-element-type="section" class="zpsection "><style type="text/css"></style><div class="zpcontainer-fluid zpcontainer"><div data-element-id="elm_6ith8KEZSleadGKYWakANQ" data-element-type="row" class="zprow zprow-container zpalign-items- zpjustify-content- " data-equal-column=""><style type="text/css"></style><div data-element-id="elm_7-rsvcirRWajhFJ5sHxI5A" data-element-type="column" class="zpelem-col zpcol-12 zpcol-md-12 zpcol-sm-12 zpalign-self- "><style type="text/css"></style><div data-element-id="elm_nALsyntxRlmaae0-XH5JfA" data-element-type="heading" class="zpelement zpelem-heading "><style></style><h2
 class="zpheading zpheading-align-center zpheading-align-mobile-center zpheading-align-tablet-center " data-editor="true"><span>Master data cleanup to stabilise ERP (products, locations, vendors, BoMs)</span></h2></div>
<div data-element-id="elm_AlAL0Td9RpqZ9dRloEtagg" data-element-type="text" class="zpelement zpelem-text "><style></style><div class="zptext zptext-align-center zptext-align-mobile-center zptext-align-tablet-center " data-editor="true"><p style="text-align:left;"><strong>Client&nbsp;</strong></p><p></p><div><div><p style="text-align:left;">Manufacturing and warehousing businesses using ERP for purchasing and planning.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>The challenge&nbsp;</strong></p><p style="text-align:left;">Poor master data breaks purchasing and planning. When product records, locations, vendors, and BoMs are inconsistent, the ERP cannot produce reliable signals. Teams then revert to manual workarounds.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>What we did&nbsp;</strong></p><p style="text-align:left;">We stabilised ERP performance by cleaning up master data and introducing standards.&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>Standards introduced:&nbsp;</strong></p><p style="text-align:left;">• Naming conventions&nbsp;</p><p style="text-align:left;">• Mandatory fields&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>How we prevented relapse&nbsp;</strong></p><p style="text-align:left;">• Clear owners of information were assigned&nbsp;</p><p style="text-align:left;">• Ongoing responsibility to maintain data quality was made explicit, so master data did not become “everyone’s problem and no one’s job”&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>Results&nbsp;</strong></p><p style="text-align:left;">• Purchasing and planning became more reliable because the system inputs were consistent&nbsp;</p><p style="text-align:left;">• Teams spent less time correcting errors downstream&nbsp;</p><p style="text-align:left;"><br/></p><p style="text-align:left;"><strong>Why it matters&nbsp;</strong></p><p style="text-align:left;">Master data is not an admin task. It is operational infrastructure. When it is owned and maintained, the ERP becomes a tool for decision-making rather than a source of confusion.</p></div></div></div>
</div><div data-element-id="elm_Aro4JRUOtY3bBDIbKpyyOA" data-element-type="buttonicon" class="zpelement zpelem-buttonicon zscsutom-banner-btn "><style> [data-element-id="elm_Aro4JRUOtY3bBDIbKpyyOA"].zpelem-buttonicon{ border-radius:1px; } </style><div class="zpbutton-container zpbutton-align-center zpbutton-align-mobile-left zpbutton-align-tablet-left "><style type="text/css"></style><a class="zpbutton-wrapper zpbutton zpbutton-type-primary zpbutton-size-lg zpbutton-style-oval zpbutton-icon-align-right " href="javascript:;" title="Book a free intro call" title="Book a free intro call"><span class="zpbutton-icon "><svg viewBox="0 0 24 24" height="24" width="24" xmlns="http://www.w3.org/2000/svg"><path d="M10.5253 5.49475L10.5206 7.49475L15.0782 7.50541L5.47473 17.0896L6.88752 18.5052L16.5173 8.89479L16.5065 13.5088L18.5065 13.5134L18.5253 5.51345L10.5253 5.49475Z"></path></svg></span><span class="zpbutton-content">Let's Talk</span></a></div>
</div></div></div></div></div></div> ]]></content:encoded><pubDate>Sun, 12 Jul 2026 00:54:49 +0000</pubDate></item><item><title><![CDATA[Non-conformance ]]></title><link>https://www.gsdworks.com.au/case-studies/post/non-conformance</link><description><![CDATA[<img align="left" hspace="5" src="https://www.gsdworks.com.au/CAPA-lite workflow hero.png"/>Implemented a lightweight non-conformance + corrective action workflow that teams actually used (native quality app or a controlled Excel log). Enabled simple issue logging, owner assignment, and follow-up. Result: faster containment, clearer accountability, and fewer repeat issues.]]></description><content:encoded><![CDATA[<div class="zpcontent-container blogpost-container "><div data-element-id="elm_cueSliznT76BWye_3L3PJw" data-element-type="section" class="zpsection "><style type="text/css"></style><div class="zpcontainer-fluid zpcontainer"><div data-element-id="elm_3iY0zA0MStmiMSe8Uh1Www" data-element-type="row" class="zprow zprow-container zpalign-items- zpjustify-content- " data-equal-column=""><style type="text/css"></style><div data-element-id="elm_hnSKRxBWR7qVgMRhtgZIjA" data-element-type="column" class="zpelem-col zpcol-12 zpcol-md-12 zpcol-sm-12 zpalign-self- "><style type="text/css"></style><div data-element-id="elm_IYKeQnE0RAaf42_eY4hSNA" data-element-type="heading" class="zpelement zpelem-heading "><style></style><h2
 class="zpheading zpheading-align-center zpheading-align-mobile-center zpheading-align-tablet-center " data-editor="true"><span><span>Non-conformance and corrective action workflow (CAPA-lite) that actually gets used</span></span></h2></div>
<div data-element-id="elm_47iCl23cQh6uDFiBKBsAbg" data-element-type="text" class="zpelement zpelem-text "><style></style><div class="zptext zptext-align-center zptext-align-mobile-center zptext-align-tablet-center " data-editor="true"><p style="text-align:left;"></p><p style="text-align:left;"><strong>Client&nbsp;</strong></p><p style="text-align:left;"><span><span>Small and mid-sized manufacturers who needed practical quality accountability without heavy bureaucracy.</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><span><span style="font-weight:bold;">The challenge&nbsp;</span></span></p><p style="text-align:left;"><span><span>Many SMEs either have no non-conformance process, or they have a process that is too complex to maintain. The result is repeat issues and a familiar pattern: “We had this problem before. What did we do last time?”&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><strong>What we did&nbsp;</strong></p><p style="text-align:left;"><span><span>We implemented a lightweight non-conformance and corrective action workflow that teams could actually sustain. Depending on the environment:&nbsp;</span></span></p><p style="text-align:left;">• In some systems, the native quality app was used for logging&nbsp;</p><p style="text-align:left;">• In other cases, a controlled Excel-based log was implemented where it was the most practical option&nbsp;</p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><span><span style="font-weight:bold;">What ‘good enough’ looked like&nbsp;</span></span></p><p style="text-align:left;"><span><span>• Basic logging of issues&nbsp;</span></span></p><p style="text-align:left;"><span><span>• Tracking of resolutions&nbsp;</span></span></p><p style="text-align:left;"><span><span>• Clear accountability through assigned owners and follow-up&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><strong>Results&nbsp;</strong></p><p style="text-align:left;"><span><span>• Clearer accountability&nbsp;</span></span></p><p style="text-align:left;"><span><span>• Faster containment and resolution&nbsp;</span></span></p><p style="text-align:left;"><span><span>• Reduced repeat issues because previous actions were visible and searchable&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><span><span style="font-weight:bold;">Why it matters&nbsp;</span></span></p><p style="text-align:left;"><span><span>A simple quality workflow that gets used beats a perfect workflow that gets ignored. The goal is not paperwork. The goal is learning and repeatability.&nbsp;</span></span></p></div>
</div><div data-element-id="elm_ezNG9-Z7RzHie58w0fy2xg" data-element-type="buttonicon" class="zpelement zpelem-buttonicon zscsutom-banner-btn "><style> [data-element-id="elm_ezNG9-Z7RzHie58w0fy2xg"].zpelem-buttonicon{ border-radius:1px; } </style><div class="zpbutton-container zpbutton-align-center zpbutton-align-mobile-left zpbutton-align-tablet-left "><style type="text/css"></style><a class="zpbutton-wrapper zpbutton zpbutton-type-primary zpbutton-size-lg zpbutton-style-oval zpbutton-icon-align-right " href="javascript:;" title="Book a free intro call" title="Book a free intro call"><span class="zpbutton-icon "><svg viewBox="0 0 24 24" height="24" width="24" xmlns="http://www.w3.org/2000/svg"><path d="M10.5253 5.49475L10.5206 7.49475L15.0782 7.50541L5.47473 17.0896L6.88752 18.5052L16.5173 8.89479L16.5065 13.5088L18.5065 13.5134L18.5253 5.51345L10.5253 5.49475Z"></path></svg></span><span class="zpbutton-content">Let's Talk</span></a></div>
</div></div></div></div></div></div> ]]></content:encoded><pubDate>Sun, 12 Jul 2026 00:42:12 +0000</pubDate></item><item><title><![CDATA[Routing and work centres]]></title><link>https://www.gsdworks.com.au/case-studies/post/routing-and-work-centres</link><description><![CDATA[<img align="left" hspace="5" src="https://www.gsdworks.com.au/Capacity planning routing hero.png"/>Implemented realistic routing and work-centre data (setup/run times) using motion studies. Capacity plans reflected real constraints, reducing overtime and rescheduling. Work was split into linked high-skill and low-skill steps, easing bottlenecks and increasing output.]]></description><content:encoded><![CDATA[<div class="zpcontent-container blogpost-container "><div data-element-id="elm_fhJ2ZXhBTAapETW2SZ5hjQ" data-element-type="section" class="zpsection "><style type="text/css"></style><div class="zpcontainer-fluid zpcontainer"><div data-element-id="elm_MkDO1LsdRnG-PZGn2Q3S1Q" data-element-type="row" class="zprow zprow-container zpalign-items- zpjustify-content- " data-equal-column=""><style type="text/css"></style><div data-element-id="elm_tkzrKKjQRZKJHUqtR3FjKw" data-element-type="column" class="zpelem-col zpcol-12 zpcol-md-12 zpcol-sm-12 zpalign-self- "><style type="text/css"></style><div data-element-id="elm_lSpa8jy_RD-vvMEqhAOv3w" data-element-type="heading" class="zpelement zpelem-heading "><style></style><h2
 class="zpheading zpheading-align-center zpheading-align-mobile-center zpheading-align-tablet-center " data-editor="true"><span>Routing and work centre setup for realistic capacity planning</span></h2></div>
<div data-element-id="elm_n7I5j9RbT9GZ7tkJTP8lfA" data-element-type="text" class="zpelement zpelem-text "><style></style><div class="zptext zptext-align-center zptext-align-mobile-center zptext-align-tablet-center " data-editor="true"><p style="text-align:left;"><span><span style="font-weight:bold;">Client&nbsp;</span></span></p><p style="text-align:left;"><span><span>Manufacturing businesses that needed realistic capacity planning and better labour utilisation.&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><strong>The challenge&nbsp;</strong></p><p style="text-align:left;"><span><span>When run times, setup times, and work centre capacity are not defined properly, schedules become optimistic and delivery promises become unreliable. Teams compensate with overtime and constant rescheduling.&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><span><span style="font-weight:bold;">What we did&nbsp;</span></span></p><p style="text-align:left;"><span><span>We implemented routing and work centre data that reflected real work.&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><strong>This included:&nbsp;</strong></p><p style="text-align:left;"><span><span>• Defining run times and setup times&nbsp;</span></span></p><p style="text-align:left;"><span><span>• Using motion studies to validate time assumptions What became visible Once routing data was realistic, it became clear that some tasks could be split into two linked activities:&nbsp;</span></span></p><p style="text-align:left;"><span><span>• A higher-skilled portion of the work&nbsp;</span></span></p><p style="text-align:left;"><span><span>• A lower-skilled portion of the work This maintained one-piece flow while allowing higher-skilled workers to focus their energy where it created the most value.&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><span><span style="font-weight:bold;">Results&nbsp;</span></span></p><p style="text-align:left;"><span><span>• Higher output with less overtime</span></span></p><p style="text-align:left;"><span><span>&nbsp;• Reduced bottlenecks because labour allocation matched the true constraint&nbsp;</span></span></p><p style="text-align:left;"><span><span><br/></span></span></p><p style="text-align:left;"><strong>Why it matters&nbsp;</strong></p><p style="text-align:left;"><span><span>Capacity planning is only as good as the data behind it. When routing and work centre assumptions match reality, scheduling becomes a practical tool instead of a constant negotiation.&nbsp;</span></span></p></div>
</div><div data-element-id="elm_-vqMiMZ27N9C5bByBoVJCA" data-element-type="buttonicon" class="zpelement zpelem-buttonicon zscsutom-banner-btn "><style> [data-element-id="elm_-vqMiMZ27N9C5bByBoVJCA"].zpelem-buttonicon{ border-radius:1px; } </style><div class="zpbutton-container zpbutton-align-center zpbutton-align-mobile-left zpbutton-align-tablet-left "><style type="text/css"></style><a class="zpbutton-wrapper zpbutton zpbutton-type-primary zpbutton-size-lg zpbutton-style-oval zpbutton-icon-align-right " href="javascript:;" title="Book a free intro call" title="Book a free intro call"><span class="zpbutton-icon "><svg viewBox="0 0 24 24" height="24" width="24" xmlns="http://www.w3.org/2000/svg"><path d="M10.5253 5.49475L10.5206 7.49475L15.0782 7.50541L5.47473 17.0896L6.88752 18.5052L16.5173 8.89479L16.5065 13.5088L18.5065 13.5134L18.5253 5.51345L10.5253 5.49475Z"></path></svg></span><span class="zpbutton-content">Let's Talk</span></a></div>
</div></div></div></div></div></div> ]]></content:encoded><pubDate>Sun, 12 Jul 2026 00:32:42 +0000</pubDate></item></channel></rss>